Welcome to this beautifully updated, turnkey home featuring brand-new LVP flooring throughout. Every room in this home has been tastefully upgraded. The bright, open floor plan has a desirable downstairs bedroom and full bath.
Chef’s kitchen includes warm maple cabinetry, granite countertops, custom tile backsplash, and KitchenAid stainless appliances.
Upstairs, the luxurious primary suite offers a spa-like bath with exquisite Carrara marble floors, matching marble countertops, and contemporary round mirrors.
Relax or entertain in the private backyard featuring a built-in outdoor kitchen with BBQ grill, pizza oven, patio area, and lush artificial turf. Truly updated throughout and move-in ready!
Lot size: 10,395 sq ft
Schools: Award Winning Poway Unified Schools
- Park Village Elementary
- Mesa Verde Middle
- Westview High
Home Highlights:
- No HOA. No Mello Roos
- Near Hwy 56, I-15, shopping, restaurants, library, fire & police stations, and YMCA
Home Upgrades:
- 1998- Installed a complete French drain system completely around the house- Eliminates any water from getting to the slab.
- 2006- Full kitchen upgrade with custom maple cabinets and granite countertops.Kitchen-Aid appliances.
- 2006- Family room ceiling upgraded with recessed lights. Fireplace updated
- 2006- Electrical panel upgraded to 200amp
- 2013- HVAC system replaced- AC and furnace
- 2016- Solar added Semper Solaris installer- Sun Power Panels – Owned
- 2016- Complete Primary bathroom updated – Carrara marble countertops and Carrara flooring, custom tile shower pan with tile to ceiling. Glass shower doors. Custom mirrors
- 2018- Synthetic Grass added back yard
- 2019- Complete upstairs bathroom remodel- vanity with Carrara marble countertop, porcelain flooring, and deep soaking tub with tiling to ceiling.
- 2019- Built-in gas BBQ
- 2020- Downstairs bathroom-Carrara Flooring, vanity with Carrara marble countertop
- 2021- Painted eaves and pergolas
- 2021- Synthetic Turf installed in front yard
- 2021 – New vinyl fencing
- 2021 – Roof maintenance- New paper lower portion and all vents resealed
- 2023 – Re-stucco retaining walls
- 2023 – Installed new vinyl windows
- 2023 – New water heater
- 2026 – LVP flooring installed throughout house.